Sallins Playground – Planning Application Underway

The Sallins playground has taken a step closer to construction with the publication today of the planning documents by which the council seeks a “Part 8” approval to proceed with the project.

Outline location for the Sallins community playground.

Location for the Sallins community playground.

These documents are quite technical in nature but show the exact location of the proposed playground and deal with all the environmental and planning considerations that may be relevant. These proposals are on display both in the council offices and in Café Grange and any interested parties can make a submission up to the 29th September. If you support the playground I would encourage you to email a supporting submission, details how to do so are at the end. Note these documents do not get into the detailed design of the playground itself, but if you had any thoughts on that, this would also be a good time to send them to the council. I attach here all the relevant documentation. I also want to again acknowledge that the proposed playground is to be built on land owned by Sallins parish and I want to thank them for their very decent and generous accommodation in enabling this project to happen. The below image indicates the exact location where the playground is intended to sit between the church, community centre and national school. sallins_playground_location

You can review the various documentation at these links sallins-playground-part-8-application-report, sallins-playground-part-8-final-location-map-a3l-1, sallins-playground-part-8-final-a1-l-1.

The detailed design of the playground is subject to a tender process and will come after this. However it will satisfy the following high level specification:

    • The playground will cater for 1-12 years old.
    • It will contain a range of equipment for children from 1-6 and 6-12 years. The equipment may include the following. Swings, Slides, Rockers, Seesaw, Play Panels, Multi Play Units, Sand & Water Play & landscaping.
    • It is envisaged that the grass contained within the existing site will be retained where possible.
    • Additional surfaces which may be used in the design of the playground are rubber surfacing, woodchip and sand.
    • The design may also contain landscape features such as mounding, sand pit, planting and living willow structures and tree and shrub planting.
    • It is likely the construction of the playground will take 12-16weeks from starting on site to completion and opening. This timeframe is dependent on weather and ground conditions.
    • Equipment with  varying heights will be used throughout the playground to a maximum height of 5.5m
    • any surface water drainage which may be necessary will be attenuated on site.

The relevant contact is Simon Wallace, Senior Executive Parks Superintendent, Kildare County Council, Devoy Park, Naas, Co. Kildare before 4.00 p.m. on Friday 29th  September 2017.  Submissions should be clearly headed “Sallins Community Playground”  and you can send them by post or email them to

Telescope Switch On in Offaly

20476417_10155364678036047_5891420325048509082_nI was in Birr Castle recently for the switch-on of the I-LOFAR radio telescope which is Ireland’s part of a giant European telescope which can scan deep space. It works as a set of distributed nodes which each send data back to a central supercomputer.

The Castle has been a home for astronomers for centuries since the original Lord Rosse built the world’s biggest telescope there in the 1800s. The technology has changed but the intention remains the same and the current Lord Rosse was on hand to send the latest model live with us last week. Continue Reading →

Drones Bill Introduced in Dáil

droneI was delighted to introduce my second Bill at first stage in the Dáil yesterday. The Small Unmanned Aircraft (Drones) Bill 2017, which you can read in full here, aims to legislate for the use of Drones. You can also read the transcript of my speech introducing the Bill here. I have met many organisations, hobbists and other stakeholders to ensure the Bill provides saftey and best pracitises without taking away the enjoyment of Drone use. Continue Reading →

Motion to evolve Community Employment Schemes

Today I penned a motion to improve the working of Community Employment Schemes. Please see the motion to support Community Employment Schemes here.

The motion aims to ensure the social element of CE Schemes, review the impact Jobpath is having on CE Schemes, allow more employees to stay on the their scheme, and to review the participation limits of older people on the scheme. Continue Reading →

Commitment from Taoiseach in his first Leaders Questions

I have called on the Taoiseach, in his first Dáil debate since being elected to the role,  to urge his Government officials to utilise digital technologies when answering queries. The programme for Government includes a commitment to improve the flow of information from Departments to Deputies. Continue Reading →