Things that smell bad in the night..

It’s been a busy few weeks in the life of waste processing in the greater Naas area, and in particular on one stretch of road along Kerdiffstown and Monread, where not one but three current or proposed waste complexes have received permissions, injunctions or stays of execution over the recent while. I summarise below the current state of play.

dumps

Bio Energy Plant
A huge number of objections were received by Kildare county council against the proposed bio-energy complex at Monread / Kerdiffstown. The upshot of this was that the council refused planning permission for the proposed facility. The owner now has five weeks to appeal this decision. Residents or interested parties can also make a submission on the appeal.

NB Whilst the proposed facility is located adjacent to the existing Kerdiffstown dump, however the proposal comes in from a separate party, an M&M Coldstores company.

Existing Kerdiffstown Dump
After almost three years of filing by the EPA the high court granted a temporary injunction against the A1 waste facility at Kerdiffstown on Friday 14th May. This prevents A1 from lodging any further waste into this landfill. A question then arises as to how the estimated 1.5 million tonnes of unprocessed waste in the landfill is to be cleaned up. I have raised this question with the Minister and it is also being pursued by a number of parties including the EPA and the CAN (Clean Air Naas) group (www.can.ie).

Extension to Kerdiffstown Dump
Although the existing dump has now been shut down, at least temporarily, the council simultaneously granted planning permission for the construction of a new dump on an adjoining 26 acre site across the road from the existing plant. The council maintain that each planning proposal is dealt with on its own merits and this application satisfied the various grounds. However this new extension has yet to receive a license from the EPA and that application process will be ongoing through the Summer.

Please see attached map for the location of the above three sites. At any stage residents can continue to report odours to EPA on (01)268 0100 and these will all be logged and referenced in future cases and applications to extend / continue operations.

An féar gortha agus an gorta mór

Last Summer I spent a few weeks in Connemara. I fell in love with the region, its people, landscape and history. I particularly relished the folklore and the indomitable spirit of resistance and survival.

On right is a photo of the famine memorial at Delphi County Mayo. Hundreds perished here after being forced to trek  overnight for alms then refused.

Today is National Famine Commemoration Day.

In honour I publish for the first time a short story I wrote set amongst the landscape, if not the exact time period, of An Gorta Mór.

Continue reading

Sallins Train Timetable

I recently made a submission to Irish Rail (IR) on the new timetable, on behalf of NASRUG and as part of a process of ongoing consultation with IR. The hope is this may be considered as part of the next issued timetable, which is due out in December, but an outside chance of coming onstream earlier due to the new line capacity offered by the Kildare Route Project.

My key timetable points below:

Naas & Sallins Rail Users Group – NASRUG

Timetable Feedback 2010.

Submitted: James Lawless
(Contact 086 834 8869, james@jameslawless.ie)

Morning ex Sallins

Problem: Too large a gap between 8.15 and 8.59
Solution: Restore 8.15 to 8.25 or add new train 8.30?

Evening ex Heuston

Problem: Gap between 18.50, 20.10, 21.10
Solution: Reschedule as 19.30, 20.22, 21.10?

Connecting Trains

Problem: Commuters charged extra for making connections e.g. via Newbridge
Solution: Allow season ticket holders this flexibility.

Capacity

Problem: Some trains now running as three carriages
Solution: Allow extra carriages on busier trains (e.g. 7.45 ex Sallins)

Sundays & Bank Holidays

Problem: No evening Sunday service home (last train departs 6.15pm)
Solution: Schedule later Sunday evening service, e.g. 7.30pm or 8pm

Problem: No bank holiday service at all
Solution: Run Sunday or other reduced service level on bank holidays.

(Later Sunday service especially important during championship summers!)